top of page

Jubilee Bridge, Panmure Basin

Metric Surveying continued our longstanding relationship with Oxcon to assist with the Jubilee Bridge project.

Client: Oxcon

Metric Surveying continued our longstanding relationship with Oxcon to assist with the Jubilee Bridge project.


We combined UAV, TLS and conventional survey methodologies to provide data to support the design and construction methodology planning and development. along with setout of the new structure piers, foundations and for fabrication and assembly of the new struture


The original bridge – previously called the Jubilee Bridge – was built in 1984 and had been out of service since July 2023, as it had reached the end of its lifespan.


The new replacement bridge was assembled offsite at Pakuranga Road, and was transported and lifted onto site in late December 2024 via a 600-tonne crane, one of the largest mobile cranes in the country.


Address

Level 1, 182 Great South Rd,
Epsom, Auckland 1051
New Zealand 

Contact

office@metricsurveying.co.nz
 

Corey  020 463 8742

Lee 021 422 548

Follow

  • LinkedIn
SiteWise-Gold-2025.jpg
PREQUAL Totika Scheme Logo_edited.png

© 2025 Metric Surveying

bottom of page